Monday, February 28, 2011



Trusses on truck


Trusses being unstrapped


Trusses being unloaded


Trusses on pavement on 2x4's


Lumber covered with plastic



Covering lumber with plastic



Windows removed on back and rafter tails cut off


Siding removed from back gable



Monday, February 21, 2011

Interior floor removed by plumber to tie in ac drain. Holes drilled into concrete with rebar installed


Interior floor removed with rebar installed



Vapor barrier with rebar


Pouring concrete with boom truck



Finishing building pad concrete



Building pad concrete finished



Friday, February 18, 2011


Interior footing on north side of building


Interior footing on south side of building



Interior footing poured



Building pad ready for stone






Placing stone




Building pad ready for roller



Roller used on building pad



Installing vapor barrier


Rebar installed






Tuesday, February 15, 2011

Installing rebar in spread footing


Posted by Don McClure from
iPad.

Rebar for interior footing to pour on top



Pouring footings


Footings poured



Stem wall forms


Footings poured


Stem wall forms being installed


Stem wall with brick ledge


Plumbing being installed under slab


Plumbing drain line installed


Stem walls installed


Stem walls north east corner


Stem walls installed with brick ledge


Anchor bolts installed


Stem walls with anchor bolts installed


Plumbing roughed in


Stem walls poured


Digging interior footings


Digging interior footings



Friday, February 11, 2011

Getting footings ready for rebar


Installation of rebar


Spread footing at the end of sheer wall A


Footing that interior footing turns down on


Footing that interior footing turns down on



Wednesday, February 2, 2011

2-2-2011

Tearing out the rostrum andsheetrock


Chapel with carpet,sisal,chair rail,and sheetrockremoved


Chapel with ceiling removed


Hallway on west of building with suspended ceiling removed


Hallway on south side of building with suspended ceiling removed


Hallway on north side of building with carpet,sisal,chair rail,and suspended ceiling removed


Worker demoing chair rail in hallway



Posted by Don McClure from iPad.